Black Dog Long Recall Lead 5m Regular

[BDW-04618]
$29.95
Available Options:
Colour:
    • Black:
    • Blue:
    • Pink:
    • Green:
    • Purple:
    • Red:
    • Orange:

Black Dog Long Recall Lead 5m Regular

For training dogs on Recall,or allowing dogs a roam in the park, or the beach, while still maintaininglead control. 4.8 metres long.

  • Product Description
    For training dogs on Recall, or allowing dogs a roam in the park, or the beach, while still maintaining lead control.

    Folds neatly to hang convenientlyfrom belt loop when not in use.

    Size Guide:
    Width: 20 mm
    Length: 5 metre (approx)
    Hook: Medium Snap


  • Product Reviews

Added to Wishlist.

Black Dog Long Recall Lead 5m Regular

Added to Cart.

Black Dog Long Recall Lead 5m Regular

View Cart