Black Dog Long Lead 5m Regular
[ BDW-04618 ]
$29.95
For training dogs on Recall, or allowing dogs a roam in the park, or the beach, while still maintaining lead control.

Folds neatly to hang convenientlyfrom belt loop when not in use.

Size Guide:
Width: 20 mm
Length: 5 metre (approx)
Hook: Medium Snap


Available Options:
Colour:
Black:
Blue:
Pink:
Green:
Purple:
Red:
Reviews