Black Dog Long Lead 4.8m Mini
[ BDW-04734 ]
$27.90
For training dogs on Recall, or allowing dogs a roam in the park, or the beach, while still maintaininglead control.

Folds neatly to hang convenientlyfrom belt loop when not in use.

Size Guide:
Width: 12 mm
Length: 4.8 metre (approx)
Hook: Small Snap


Available Options:
Colour:
Black:
Blue:
Green:
Purple:
Red:
Pink:
Reviews