Black Dog Long Lead Recall 5m Mini
Black Dog Long Lead Recall 5m Mini
For training dogs on Recall,or allowing dogs a roam in the park, or the beach, while still maintaining lead control. 4.8 metres long.
-
Product Description
For training dogs on Recall, or allowing dogs a roam in the park, or the beach, while still maintaininglead control.
Folds neatly to hang convenientlyfrom belt loop when not in use.
Size Guide:
Width: 12 mm
Length: 5 metre (approx)
Hook: Small Snap
- Product Reviews










